Dipl.-Math. Sascha Herrmann

Publications

Papers in conference proceedings and collected volumes

  • C. Schwindt, S. Herrmann, H. Sagebiel
    A closed-loop approach to continuous process scheduling.
    In: Sun, H., Jiao, R., Xie, M. (eds.), Proceedings of the 2009 IEEE International Conference on Industrial Engineering and Engineering Management, Hong Kong, December 8-11, 2009, pp. 1951-1955 (honored with Conference Paper Award)
    ►  Download
     
  • S. Herrmann, C. Schwindt
    A heuristic for the short-term planning of multi-purpose continuous plants.
    18th European Symposium on Computer Aided Process Engineering. Elsevier, Amsterdam, 2008, Paper FP00309
    ►  Download
     
  • S. Herrmann, C. Schwindt
    Planning and scheduling continuous operations in the process industries.
    In: Günther, H.-O., Mattfeld, D.C., Suhl, L., (eds.), Management logistischer Netzwerke. Physica, Heidelberg, 2007, pp. 279-299
    ►  Download
     
  • C. Schwindt, S. Herrmann, N. Trautmann
    A heuristic decomposition method for the short-term planning of continuous plants.
    Proceedings of the Tenth International Workshop on Project Management and Scheduling, Posnan, April 26-28, 2006, pp. 313-318
    ►  PDF
     
  • C. Schwindt, S. Herrmann, N. Trautmann
    Planning and scheduling of multipurpose continuous plants.
    In: Marquardt, W., Pantelides, C. (eds.), 16th European Symposium on Computer Aided Process Engineering and 9th International Symposium on Process Systems Engineering. Elsevier, Amsterdam, 2006, pp. 2159-2164
    Download

Further publications

  • C. Schwindt, R. Fink, S. Herrmann, H. Sagebiel
    Modelle und Methoden für die Anlagenbelegungsplanung in der Prozessindustrie.
    TUContact 17, 62-67, 2005

Talks and presentations

  • Anlagenbelegungsplanung bei kontinuierlicher Prozessführung
    Interuniversitärer Doktorandenworkshop, Hildesheim, Mai 2008
  • A new one-phase priority-rule based schedule-generation scheme for scheduling continuous operations in the process industries
    Operations Research 2007, Saarbrücken, September 2007
  • Heuristic Short-Term Planning of Multipurpose Continuous Plants in the Process Industries
    INFORMS International, Puerto Rico, Juli 2007
  • Planning and scheduling continuous operations in the process industries
    Supply Network and Logistics Management, St. Leon-Rot, Februar 2007
  • A priority-rule based method for process scheduling: The continuous production case
    Operations Research 2006, Karlsruhe, September 2006
  • Planning and scheduling of multipurpose continuous plants.
    16th European Symposium on Computer Aided Process Engineering (ESCAPE), Garmisch-Partenkirchen, Juli 2006
  • A priority-rule based method for continuous process scheduling.
    21st European Conference on Operational Research, Reykjavik, Juli 2006
  • Belegungsplanung kontinuierlicher Mehrprodukt-Anlagen in der Prozessindustrie.
    Interuniversitärer Doktorandenworkshop, Goslar, Mai 2006
  • Konzeption einer Rückkopplung zwischen Ablauf- und Mengenplanung.
    Workshop zum DFG-Projekt "Produktionsplanung in der Prozessindustrie", Bern, März 2006
  • Prioritätsregelverfahren zur Anlagenbelegungsplanung für kontinuierliche Prozessführung.
    Workshop zum DFG-Projekt "Produktionsplanung in der Prozessindustrie", Berlin, Dezember 2005
  • Klassifikationsschema für Fallbeispiele der Anlagenbelegungsplanung.
    Workshop zum DFG-Projekt "Produktionsplanung in der Prozessindustrie", Berlin, April 2005

Curriculum Vitae

02/2005 - 06/2008Wissenschaftlicher Angestellter an der TU Clausthal
12/2004Diplom (Gesamtnote: mit Auszeichnung)
11/1998 - 12/2004Mathematikstudium an der Universität Bayreuth mit Nebenfach Informatik und Schwerpunktgebiet Operations Research.
Diplomarbeit zum Thema "Evolutionäre Neuronale Netze - Theorie und Praxis"
06/1997Abitur, Graf-Münster-Gymnasium, Bayreuth

PhD project and research areas

Anlagenbelegungsplanung für Sortenproduktion

Business card @ www.xing.com

 

Sascha Herrmann

Dipl.-Math. Sascha Herrmann

zooplus AG, München

www.zooplus.de