Dipl.-Math. Sascha Herrmann
Publications
Papers in conference proceedings and collected volumes
- C. Schwindt, S. Herrmann, H. Sagebiel
A closed-loop approach to continuous process scheduling.
In: Sun, H., Jiao, R., Xie, M. (eds.), Proceedings of the 2009 IEEE International Conference on Industrial Engineering and Engineering Management, Hong Kong, December 8-11, 2009, pp. 1951-1955 (honored with Conference Paper Award)
► Download
- S. Herrmann, C. Schwindt
A heuristic for the short-term planning of multi-purpose continuous plants.
18th European Symposium on Computer Aided Process Engineering. Elsevier, Amsterdam, 2008, Paper FP00309
► Download
- S. Herrmann, C. Schwindt
Planning and scheduling continuous operations in the process industries.
In: Günther, H.-O., Mattfeld, D.C., Suhl, L., (eds.), Management logistischer Netzwerke. Physica, Heidelberg, 2007, pp. 279-299
► Download
- C. Schwindt, S. Herrmann, N. Trautmann
A heuristic decomposition method for the short-term planning of continuous plants.
Proceedings of the Tenth International Workshop on Project Management and Scheduling, Posnan, April 26-28, 2006, pp. 313-318
► PDF
- C. Schwindt, S. Herrmann, N. Trautmann
Planning and scheduling of multipurpose continuous plants.
In: Marquardt, W., Pantelides, C. (eds.), 16th European Symposium on Computer Aided Process Engineering and 9th International Symposium on Process Systems Engineering. Elsevier, Amsterdam, 2006, pp. 2159-2164
► Download
Further publications
- C. Schwindt, R. Fink, S. Herrmann, H. Sagebiel
Modelle und Methoden für die Anlagenbelegungsplanung in der Prozessindustrie.
TUContact 17, 62-67, 2005
Talks and presentations
- Anlagenbelegungsplanung bei kontinuierlicher Prozessführung
Interuniversitärer Doktorandenworkshop, Hildesheim, Mai 2008 - A new one-phase priority-rule based schedule-generation scheme for scheduling continuous operations in the process industries
Operations Research 2007, Saarbrücken, September 2007 - Heuristic Short-Term Planning of Multipurpose Continuous Plants in the Process Industries
INFORMS International, Puerto Rico, Juli 2007 - Planning and scheduling continuous operations in the process industries
Supply Network and Logistics Management, St. Leon-Rot, Februar 2007 - A priority-rule based method for process scheduling: The continuous production case
Operations Research 2006, Karlsruhe, September 2006 - Planning and scheduling of multipurpose continuous plants.
16th European Symposium on Computer Aided Process Engineering (ESCAPE), Garmisch-Partenkirchen, Juli 2006 - A priority-rule based method for continuous process scheduling.
21st European Conference on Operational Research, Reykjavik, Juli 2006 - Belegungsplanung kontinuierlicher Mehrprodukt-Anlagen in der Prozessindustrie.
Interuniversitärer Doktorandenworkshop, Goslar, Mai 2006 - Konzeption einer Rückkopplung zwischen Ablauf- und Mengenplanung.
Workshop zum DFG-Projekt "Produktionsplanung in der Prozessindustrie", Bern, März 2006 - Prioritätsregelverfahren zur Anlagenbelegungsplanung für kontinuierliche Prozessführung.
Workshop zum DFG-Projekt "Produktionsplanung in der Prozessindustrie", Berlin, Dezember 2005 - Klassifikationsschema für Fallbeispiele der Anlagenbelegungsplanung.
Workshop zum DFG-Projekt "Produktionsplanung in der Prozessindustrie", Berlin, April 2005
Curriculum Vitae
02/2005 - 06/2008 | Wissenschaftlicher Angestellter an der TU Clausthal |
12/2004 | Diplom (Gesamtnote: mit Auszeichnung) |
11/1998 - 12/2004 | Mathematikstudium an der Universität Bayreuth mit Nebenfach Informatik und Schwerpunktgebiet Operations Research. Diplomarbeit zum Thema "Evolutionäre Neuronale Netze - Theorie und Praxis" |
06/1997 | Abitur, Graf-Münster-Gymnasium, Bayreuth |
PhD project and research areas
Anlagenbelegungsplanung für Sortenproduktion