Prof. Dr. Christoph Schwindt
-
Publications
Monographs
- C. Schwindt, J. Zimmermann (eds.)
Handbook on Project Management and Scheduling Vol. 1. International Handbooks on Information Systems.
Springer, Cham, 2015
► Download
- C. Schwindt, J. Zimmermann (eds.)
Handbook on Project Management and Scheduling Vol. 2. International Handbooks on Information Systems.
Springer, Cham, 2015
► Download
- M. Morlock, C. Schwindt, N. Trautmann, J. Zimmermann (eds.)
Perspectives on Operations Research: Essays in Honor of Klaus Neumann.
Deutscher Universitäts-Verlag, Wiesbaden, 2006
► Download
- C. Schwindt
Resource Allocation in Project Management.
Springer, Berlin, 2005
Rezensionen:
A. Zilinskas in Interfaces 37, 86-87, 2007
Ph. Baptiste in Operations Research Letters 35, 139-140, 2006
► Download
- K. Neumann, C. Schwindt, J. Zimmermann
Project Scheduling with Time Windows and Scarce Resources, 2. Auflage.
Springer, Berlin, 2003
Rezensionen:
H.K. Alfares in Int J Prod Res 42, 4427, 2004
J. Xue in J Oper Res Soc 56, 2005
J. Blazewicz in Zentralblatt MATH 1059, 2005
► Download
- C. Schwindt
Verfahren zur Lösung des ressourcenbeschränkten Projektdauerminimierungsproblems.
Shaker, Aachen, 1998
Refereed Journals
- B. Alhaji, J. Beecken, R. Ehlers, J. Gertheiss, F. Merz, J. P. Müller, M. Prilla, A. Rausch, A. Reinhardt, D. Reinhardt, C. Rembe, N.-O. Rohweder, C. Schwindt, S. Westphal, J. Zimmermann
Engineering human-machine teams for trusted collaboration. Big Data and Cognitive Computing 4(4), 35, 2020
► Download
- N. Trautmann, C. Schwindt
A cyclic approach to large-scale short-term planning in chemical batch production.
Journal of Scheduling 12, 595-606, 2009
► Download
- F. Ballestin, C. Schwindt, J. Zimmermann
Resource leveling in make-to-order production: Modeling and heuristic solution method.
International Journal of Operations Research 4, 50-62, 2007
► Download
- K. Neumann, C. Schwindt, N. Trautmann
Scheduling of continuous and discontinuous material flows with intermediate storage restrictions.
European Journal of Operational Research 165, 495-509, 2005
► Download
- C. Mellentien, C. Schwindt, N. Trautmann
Scheduling the factory pick-up of new cars.
OR Spectrum 26, 579-601, 2004
► Download
- R. Kolisch, K. Meyer, R. Mohr, C. Schwindt, M. Urmann
Ablaufplanung für die Leitstrukturoptimierung in der Pharmaforschung.
Zeitschrift für Betriebswirtschaft 73, 825-848, 2003
► PDF
- K. Neumann, C. Schwindt, J. Zimmermann
Order-based neigborhoods for project scheduling with nonregular objective functions.
European Journal of Operations Research 149, 325-343, 2003
► Download
- C. Schwindt, N. Trautmann
Scheduling the production of rolling ingots: Industrial context, model, and solution method.
International Transactions in Operational Research 10, 547-563, 2003
► Download
- K. Neumann, C. Schwindt, N. Trautmann
Advanced production scheduling for batch plants in process industries.
OR Spectrum 24, 251-279, 2002.
Ist ebenfalls erschienen in: Günther, H.-O., van Beek, P. (eds.), Advanced Planning and Scheduling Solutions in Process Industries. Springer, Berlin, 2003, pp. 43-72
► Download
- C. Schwindt, J. Zimmermann
Parametrische Optimierung als Instrument zur Bewertung von Investitionsprojekten.
Zeitschrift für Betriebswirtschaft 72, 593-617, 2002
► PDF
- K. Neumann, C. Schwindt
Project scheduling with inventory constraints.
Mathematical Methods of Operations Research 56, 513-533, 2002
► Download
- K. Neumann, C. Schwindt, J. Zimmermann
Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications.
Central European Journal of Operations Research 10, 113-148, 2002
► PDF
- C. Schwindt, J. Zimmermann
A steepest ascent approach to maximizing the net present value of projects.
Mathematical Methods of Operations Research 53, 435-450, 2001
► Download
- B. Franck, K. Neumann, C. Schwindt
Project scheduling with calendars.
OR Spektrum 23, 325-334, 2001
► Download
- B. Franck, K. Neumann, C. Schwindt
Truncated branch-and-bound, schedule construction, and schedule-improvement procedures for resource-constrained project scheduling.
OR Spektrum 23, 297-324, 2001
► Download
- K. Neumann, H. Nübel, C. Schwindt
Active and stable project scheduling.
Mathematical Methods of Operations Research 52, 441-465, 2000
► Download
- C. Schwindt, N. Trautmann
Batch scheduling in process industries: An application of resource-constrained project scheduling.
OR Spektrum 22, 501-524, 2000
► Download
- K. Neumann, C. Schwindt
A capacitated hierarchical approach to make-to-order production.
European Journal of Automation 32, 397-413, 1998
► PDF
- B. Franck, K. Neumann, C. Schwindt
A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods.
OR Spektrum 19, 77-85, 1997
► Download
- K. Neumann, C. Schwindt
Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production.
OR Spektrum 19, 205-218, 1997
► Download
Papers in Proceedings and Collections
M. Sillus, C. Schwindt
A time-based schedule-generation scheme for project scheduling with storage resources.
18th International Workshop on Project Management and Scheduling. Ghent, April 6-7, 2022
► Download
F. Merz, C. Schwindt, S. Westphal, J. Zimmermann
An auction-based mechanism for the formation and scheduling of heterogeneous human-machine teams.
In: K. H. Chai, S. K. Moon, R. Jiao, M. Xie (eds.) Proceedings of the 2021 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, December 13-16, 2021, pp. 863-868
► Download
N. Krippendorff, C. Schwindt
Control of shared production buffers: A reinforcement learning approach.
In: K. H. Chai, S. K. Moon, R. Jiao, M. Xie (eds.) Proceedings of the 2021 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, December 13-16, 2021, pp. 703-707 (nominated for Best Paper Award)
► Download
- F. Merz, C. Schwindt, S. Westphal, J. Zimmermann
A multi-round auction for staff to job assignment under myopic best response dynamics.
In: T. H. Ho, K. H. Chai, R. Jiao, M. Xie (eds.) Proceedings of the 2020 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, December 14-17, 2020, pp. 1137-1141 (nominated for Best Paper Award)
► Download
- N. Krippendorff, C. Schwindt
Allocation and management of shared production buffers: Problem formulation and classification scheme.
Extended Abstracts of the 12th Conference on Stochastic Models of Manufacturing and Service Operations SMMSO 2019, pp. 85-87
- C. Schwindt
Termin- und Kapazitätsplanung.
In: H. Corsten, R. Gössinger, T. S. Spengler (eds.), Handbuch Produktions- und Logistikmanagement in Wertschöpfungsnetzwerken. de Gruyter, Berlin und Boston, 2018, pp. 624-645
► Download
- A. Heßler, C. Schwindt
Markov models for system throughput analysis in warehouse design.
In: A. Fink, A. Fügenschuh, M. J. Geiger (eds.), Operations Research Proceedings 2016. Springer, Berlin, 2017, pp. 475-480
► Download
- A. Heßler, C. Schwindt
Throughput analysis of random storage systems operated under the closest eligible location rule.
In: A. De Meyer, K. H. Chai, R. Jiao, N. Chen, M. Xie (eds.) Proceedings of the 2017 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, December 10-13, 2017, Paper IEEM17-P-0411 (nominated for Best Paper Award)
► Download
- A. Heßler, C. Schwindt
Throughput analysis of random storage systems: Closest eligible location pays.
In: T. Bousonville, T. Melo, N. Rezg, F. Vernadat (eds.) Proceedings of the 7th International Conference on Industrial Engineering and Systems Management IESM 2017, Saarbrücken, October 11-13, 2017, pp. 44-49.
► PDF
- C. Schwindt, T. Paetz
A serial schedule-generation scheme for preemptive project scheduling problems with generalized precedence relations and regular min-max criteria.
In: Proceedings of the 15th International Conference on Project Management and Scheduling, Valencia, April 19-22, 2016, pp. 210-214
► PDF
- I. Weiss, C. Schwindt
The Resource Transfer Problem.
In: Proceedings of the 15th International Conference on Project Management and Scheduling, Valencia, April 19-22, 2016, pp. 42-46
► PDF
- I. Weiss, C. Schwindt
The Resource Transfer Problem: Modeling and solving integrated scheduling and routing problems.
Proceedings of the 2016 IEEE International Conference on Industrial Engineering and Engineering Management, Bali, 2016, December 5-7, 2016, Paper IEEM16-P-0272
► Download
- C. Schwindt, T. Paetz
Continuous Preemption Problems.
In: C. Schwindt, J. Zimmermann (eds.), Handbook on Project Management and Scheduling. International Handbooks on Information Systems, Springer, Berlin, 2015, Chapter 13, pp. 251-295
► Download
- C. Schwindt, J. Zimmermann
Project management and scheduling.
In: C. Schwindt, J. Zimmermann (eds.), Handbook on Project Management and Scheduling. International Handbooks on Information Systems, Springer, Berlin, 2015, pp. xxi-xlvii
► PDF
- T. Paetz, C. Schwindt
Column generation-based lower bounds for resource leveling problems.
In: T. Fliedner, R. Kolisch, A. Naber (eds.), Proceedings of the 14th International Conference on Project Management and Scheduling, Munich, March 30-April 2, 2014, pp. 173-176
► Download
- C. Schwindt, T. Haselmann
The preemptive project scheduling problem with generalized precedence relationships.
Proceedings of the 13th International Conference on Project Management and Scheduling, Leuven, April 1-4, 2012, pp. 278-281
- B. Scholz-Reiter, C. Schwindt, E. M. Frazzon, Th. Makuschewitz
An approach to negotiation-based alignment of manufacturing and transportation systems along global production networks.
In: N. A. Duffie (ed.), Proceedings of the 44th CIRP Conference on Manufacturing Systems, Madison, WI, May 31–June 3, 2011. Omnipress, Madison, WI
- B. Scholz-Reiter, C. Schwindt, Th. Makuschewitz, E. M. Frazzon
An approach for the integration of production scheduling and inter-facility transportation within global supply chains.
In: M. D. Hanna (ed.), Proceedings of the POMS 21st Annual Conference, Vancouver, May 7-10, 2010, Paper 015-0387
► Download
- C. Schwindt, S. Herrmann, H. Sagebiel
A closed-loop approach to continuous process scheduling.
In: Sun, H., Jiao, R., Xie, M. (eds.), Proceedings of the 2009 IEEE International Conference on Industrial Engineering and Engineering Management, Hong Kong, December 8-11, 2009, pp. 1951-1955 (honored with Conference Paper Award)
► Download
- N. Trautmann, R. Fink, H. Sagebiel, C. Schwindt
A decomposition approach to short-term scheduling of multi-purpose batch processes.
18th European Symposium on Computer Aided Process Engineering. Elsevier, Amsterdam, 2008, pp. 157-162
► Download
- S. Herrmann, C. Schwindt
A heuristic for the short-term planning of multi-purpose continuous plants.
18th European Symposium on Computer Aided Process Engineering. Elsevier, Amsterdam, 2008, Paper FP00309
► Download
- N. Trautmann, R. Fink, H. Sagebiel, C. Schwindt
A MIP/RCPSP decomposition approach to short-term planning in chemical batch production with non-identical parallel processing units.
In: Helander, M., Xie, M., Jiao, R., Tan, K.C. (eds.), Proceedings of the 2007 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, December 2-5, 2007, pp. 1342-1346 (nominated for Best Paper Award)
► Download
- C. Schwindt, R. Fink, N. Trautmann
A priority-rule based method for scheduling in chemical batch production.
In: Helander, M., Xie, M., Jiao, R., Tan K.C. (eds.), Proceedings of the 2007 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, December 2-5, 2007, pp. 1347-51
► Download
- N. Trautmann, C. Schwindt
Large-scale short-term planning in chemical batch production.
In: Baptiste, Ph., Kendall, G., Munier-Kordon, A., Sourd, F. (eds.), Proceedings of the 3rd Multidisciplinary International Conference on Scheduling: Theory and Applications, Paris, August 28-31, 2007, pp. 490-497
► Download
- S. Herrmann, C. Schwindt
Planning and scheduling continuous operations in the process industries.
In: Günther, H.-O., Mattfeld, D.C., Suhl, L., (eds.), Management logistischer Netzwerke. Physica, Heidelberg, 2007, pp. 279-299
► Download
- C. Schwindt, N. Trautmann
Rolling ingots production scheduling.
Artigues, C., Demassey, S., Néron, E. (eds.), Resource-Constrained Project Scheduling: Models, Extensions, and Applications. ISTE Publishing, London, 2007, Ch. 17, pp. 263-273
► Download
- C. Schwindt, N. Trautmann
A cyclic approach to large-scale short-term planning of multi-purpose batch plants.
In: Morlock, M., Schwindt, C., Trautmann, N., Zimmermann, J. (eds.), Perspectives on Operations Research: Essays in Honor of Klaus Neumann. Deutscher Universitäts-Verlag, Wiesbaden, 2006, pp. 225-238
► PDF
- C. Schwindt, S. Herrmann, N. Trautmann
A heuristic decomposition method for the short-term planning of continuous plants.
Proceedings of the Tenth International Workshop on Project Management and Scheduling, Posnan, April 26-28, 2006, pp. 313-318
► PDF
- Trautmann, N., Schwindt, C.
A heuristic method for large-scale batch scheduling in the process industries.
In: Haasis, H.-D., Kopfer, H., Schönberger, J. (eds.), Operations Research Proceedings 2005. Springer, Berlin, 2006, pp. 155-160
► Download
- C. Schwindt, S. Herrmann, N. Trautmann
Planning and scheduling of multipurpose continuous plants.
In: Marquardt, W., Pantelides, C. (eds.), 16th European Symposium on Computer Aided Process Engineering and 9th International Symposium on Process Systems Engineering. Elsevier, Amsterdam, 2006, pp. 2159-2164
► Download
- N. Trautmann, C. Schwindt
Priority-rule based scheduling of chemical batch processes.
In: Marquardt, W., Pantelides, C. (eds.), 16th European Symposium on Computer Aided Process Engineering and 9th International Symposium on Process Systems Engineering. Elsevier, Amsterdam, 2006, pp. 2165-2170
► Download
- K. Neumann, C. Schwindt, J. Zimmermann
Resource-constrained project scheduling with time windows: Recent developments and new applications.
In: Jozefowska, J., Weglarz, J. (eds.), Perspectives in Modern Project Scheduling. Kluwer, Boston, 2006, pp. 375-407
► Download
- N. Trautmann, C. Schwindt
A MINLP/RCPSP decomposition approach for the short-term planning of batch production.
In: Piugjaner, L., Espuna, A. (eds.), 15th European Symposium on Computer Aided Process Engineering. Elsevier, Amsterdam, 2005, pp. 1309-1314
► Download
- C. Schwindt, N. Trautmann
A priority-rule based method for batch production scheduling in the process industries.
In: Ahr, D., Fahrion, R., Oswarld, M., Reinelt, G. (eds.), Operations Research Proceedings 2003. Springer, Berlin, 2004, pp. 111-118
► Download
- K. Gentner, K. Neumann, C. Schwindt, N. Trautmann
Batch production scheduling in the process industries.
In: Leung, J.Y.T. (ed.), Handbook of Scheduling: Algorithms, Models and Performance Analysis. CRC Press, Boca Raton, 2004, pp. 48.1-48.21
- C. Schwindt
Project scheduling with changeover times: A branch-and-bound approach.
Proceedings of the International Conference on Industrial Engineering and Production Management, Porto, May 26-28, 2003, pp. 44-52
► PDF
- C. Schwindt, N. Trautmann
Scheduling of rolling ingots production.
In: Leopold-Wildburger, U., Rendl, F., Wäscher, G. (eds.), Operations Research Proceedings 2002. Springer, Berlin, 2003, pp. 83-88
► Download
- J. Zimmermann, C. Schwindt
Parametric optimization for the evaluation of investment projects.
In: Proceedings of the Eight International Workshop on Project Management and Scheduling, Valencia, April 3-5, 2002, pp. 378-382
► Download
- C. Schwindt, N. Trautmann
Scheduling continuous material flows.
In: Proceedings of the 18th International Conference on CAD/CAM, Robotics, and Factories of the Future, Porto, July 3-5, 2002, pp. 757-764
► PDF
- C. Schwindt
Scheduling of continuous production in process industries.
In: Proceedings of the Eigth International Workshop on Project Management and Scheduling, Valencia, April 3-5, 2002, pp. 314-317
► PDF
- C. Schwindt, N. Trautmann
Storage problems in batch scheduling.
In: Chamoni, P., Leisten, R., Martin, A., Minnemann, J., Stadtler, H. (eds.), Operations Research Proceedings 2001. Springer, Berlin, 2002, pp. 213-217
► Download
- N. Trautmann, C. Schwindt
Storage problems in process scheduling.
In: Proceedings of the 18th International Conference on CAD/CAM, Robotics and Factories of the Future, Porto, July 3-5, 2002, pp. 749-754
► PDF
- K. Neumann, C. Schwindt, N. Trautmann
Short-term planning of batch plants in process industries.
In: Kischka, P., Leopold-Wildburger, U., Möhring, R.H., Radermacher, F.J. (eds.), Models, Methods and Decision Support for Management. Physica, Heidelberg, 2001, pp. 211-226
► Download
- C. Schwindt
Solution procedures for production planning and detailed scheduling in process industries.
In: Proceedings of the International conference on Industrial Engineering and Production Management, Québec City, August 20-23, 2001, pp. 271-280
► PDF
- C. Schwindt
Local search for the project scheduling with convex objective functions.
In: Proceedings of the Seventh International Workshop on Project Management and Scheduling, Osnabrück, April 17-19, 2000, pp. 239-241
► PDF
- C. Schwindt
Minimizing earliness-tardiness costs of resource-constrained projects.
In: Inderfurth, K., Schwödiauer, G., Domschke, W., Juhnke, F., Kleinschmiddt, P., Wäscher, G. (eds.), Operations Research Proceedings 1999. Springer, Berlin, 2000, pp. 402-407
► Download
- C. Schwindt
A branch-and-bound algorithm for the project duration problem subject to temporal and cumulative resource constraints.
In: Proceedings of the International conference on Industrial Engineering and Production Management, Glasgow, July 12-15, 1999, pp. 515-522
► PDF
- R. Kolisch, C. Schwindt, A. Sprecher
Benchmark instances for project scheduling problems.
In: Weglarz, J. (ed.), Project Scheduling: Recent Models, Algorithms and Applications. Kluwer, Boston, 1999, pp. 197-212
► Download
- C. Schwindt
Integrated multi-level capacitated lot sizing and temporal plus capacity planning.
In: Proceedings of the International Conference on Industrial Engineering and Production Management, Lyon, October 20-24, 1997, pp. 102-109
- C. Schwindt
A new branch-and-bound-based heuristic for resource-constrained project scheduling with minimal and maximal time lags.
In: Proceedings of the Fifth International Workshop on Project Management and Scheduling, Posnan, April 11-13, 1996, pp. 212-215
► PDF
- C. Schwindt
An efficient heuristic for solving resource-constrained project scheduling problems arising from make-to-order production.
In: Proceedings of the Workshop on Production Planning and Control, Mons, September 9-11, 1996, pp. 4-7
Further Publications
C. Schwindt
Bericht zum Forschungssemester 2018
► PDF
C. Schwindt, N. Trautmann, R. Fink
Hierarchische Anlagenbelegungsplanung bei Chargenproduktion.
PPS-Management 2/2008, 35-38, 2008
N. Trautmann, C. Schwindt
Methods of Plant Occupancy Planning in the Process Industry.
United States Patent, Pub. No. US 7062448 B2, 2006
C. Schwindt, R. Fink, S. Herrmann, H. Sagebiel
Modelle und Methoden für die Anlagenbelegungsplanung in der Prozessindustrie.
TUContact 17, 62-67, 2005
C. Schwindt, N. Trautmann
Operations Research im Supply-Chain-Management.
Karlsruher Transfer 28, 29-31, 2002
Working Papers
- R. Fink, C. Schwindt
A priority-rule based method for predictive-reactive batch production scheduling in the process industries
Technical Report PLC-3, Institut für Wirtschaftswissenschaft, TU Clausthal
► PDF
- C. Schwindt
Generation of resource-constrained project scheduling problems subject to temporal constraints.
Technical Report WIOR-443, Institut für Wirtschaftstheorie und Operations Research, Universität Karlsruhe (TH)
► PDF
- R. Heilmann, C. Schwindt
Lower bounds for RCPSP/max.
Techical Report WIOR-511, Institut für Wirtschaftstheorie und Operations Research, Universität Karlsruhe (TH)
► PDF
- C. Schwindt, J. Zimmermann (eds.)
-
Talks and Presentations
- Control of shared production buffers: A reinforcement learning approach. PDF
2021 IEEE International Conference on Industrial Engineering and Engineering Management, Dezember 2021 - A serial schedule-generation scheme for preemptive project scheduling problems with generalized precedence relations and regular min-max criteria. PDF
15th International Conference on Project Management and Scheduling, Valencia, April 2016 - A column-generation approach to lower bounds for resource leveling problems. PDF
20th Conference of the International Federation of Operational Research Societies (IFORS), Barcelona, Juli 2014 - Project scheduling under generalized precedence relations: A survey of structural issues, solution approaches, and applications. PDF
Plenary talk at the 14th International Conference on Project Management and Scheduling, Munich, April 2014 - Column-generation based lower bounds for project scheduling problems.
26th European Conference on Operational Research, Rome, Juli 2013 - The preemptive resource-constrained project scheduling problem with generalized precedence relationships. PDF
Workshop New Challenges in Scheduling Theory, Fréjus, Oktober 2012 - Models and bounds for preemptive project scheduling with generalized precedence relationships.
Operations Research 2012, Hannover, September 2012 - Lower and upper bounds for preemptive project scheduling with generalized precedence relationships.
25th European Conference on Operational Research, Vilnius, Juli 2012 - Temporal scheduling of projects with time-overlap trade-offs. PDF
Workshop on New Perspectives in Scheduling Theory, Hangzhou (China), Oktober 2011 - Modelle, Methoden und Anwendungen der ressourcenbeschränkten Projektplanung.
Gastvortrag am Departement Betriebswirtschaftslehre, Universität Bern, Oktober 2010 - Temporal scheduling of concurrent engineering projects.
24th European Conference on Operational Research, Lisbon, Juli 2010 - A closed-loop approach to continuous process scheduling. PDF
International Conference on Industrial Engineering and Engineering Management IEEM 2009, Hong Kong, Dezember 2009 - A closed-loop approach to continuous process scheduling problems.
23rd European Conference on Operational Research, Bonn, Juli 2009 - A closed-loop heuristic for continuous process scheduling.
Joint meeting of GOR working groups Mathematical Programming and Supply Chain Management, Bad Honnef, November 2008 - Exact and heuristic methods for continuous process scheduling.
Operations Research 2008, Augsburg, September 2008 - A heuristic for the short-term planning of multiproduct continuous plants.
18th European Symposium on Computer Aided Process Engineering, Lyon, Juni 2008 - An integrated approach to continuous process planning and scheduling.
Workshop New Challenges in Scheduling Theory, Centre International de Rencontres Mathématiques, Marseille, Mai 2008 - A priority-rule based method for scheduling in chemical batch production. PDF
2007 IEEM International Conference on Industrial Engineering and Engineering Management, Singapore, Dezember 2007 - A branch-and-bound algorithm for the preemptive resource-constrained project scheduling problem.
Operations Research 2007, Saarbrücken, September 2007 - Large-scale short-term planning in chemical batch production. PDF
Multidisciplinary International Scheduling Conference: Theory and Applications MISTA 2007, Paris, August 2007 - Enumeration schemes for scheduling problems with storage resources.
22nd European Conference on Operational Research, Prague, Juli 2007 - A comparison of relaxation-based enumeration schemes in production scheduling. PDF
Operations Research 2006, Karlsruhe, September 2006 - Planning and scheduling of multipurpose continuous plants.
16th European Symposium on Computer Aided Process Engineering, Garmisch-Partenkirchen, Juli 2006 - A cyclic approach to large-scale short-term planning of multipurpose batch plants.
21st European Conference on Operational Research, Reykjavik, Juli 2006 - A heuristic decomposition method for the short-term planning of continuous plants.
10th Workshop of the EURO Working Group on Project Management and Scheduling, Poznan, April 2006 - Robuste Projektplanung unter Ressourcenbeschränkungen.
Sitzung der Arbeitsgruppe Projektmanagement und Scheduling der Gesellschaft für Operations Research, Bonn, November 2005 - Robust project scheduling: An order-based approach. PDF
Operations Research 2005, Bremen, September 2005 - A MINLP/RCPSP decomposition approach for the short-term planning of batch production.
15th European Symposium on Computer Aided Process Engineering, Barcelona, Mai 2005 - Scheduling event-marketing activities in automotive industry: Solution procedure.
Operations Research 2004, Tilburg, September 2004 - Scheduling with storage resources. PDF
Symposium on Operations Research 2003, Heidelberg, September 2003 - Project scheduling with storage constraints: Truncated branch-and-bound algorithms.
19th European Conference on Operational Research, Istanbul, Juli 2003 - Project scheduling with changeover times: A branch-and-bound approach.
International Conference on Industrial Engineering and Production Management, Porto, Mai 2003 - Methoden zur Anlagenbelegungsplanung.
Workshop über Produktionsplanung in der Prozessindustrie, Berlin, April 2003 - Projektplanung unter Unsicherheit.
20. Südwest-Workshop über OR in Produktion und Logistik, Stuttgart, Januar 2003 - Scheduling und Ressourcenallokation: Detailed Scheduling mit Relax and Resolve.
SAP AG, Walldorf, Oktober 2002 - A branch-and-bound algorithm for the capital-rationed net present value problem. PDF
Symposium on Operations Research 2002, Klagenfurt, September 2002 - Scheduling continuous material flows.
18th International Conference on CAD/CAM Robotics, and Factories of the Future, Porto, Juli 2002 - Relaxed scheduling with SAP APO: Solution method.
16th Triennial Conference of the International Federation of Operational Research Societies, Edinburgh, Juli 2002 - Project scheduling with sequence-dependent changeover times: A branch-and-bound approach. PDF
XV Conference of the European Chapter on Combinatorial Optimization, Lugano, Mai 2002 - Scheduling of continuous production in process industries.
8th Workshop of the EURO Working Group on Project Management and Scheduling, Valencia, April 2002 - Verfahren zur Planung des ressourcenbeschränkten Projektminimierungsproblems mit planungsabhängigen Zeitfenstern.
Festcolloquium der Fakultät für Wirtschaftswissenschaften der Universität Karlsruhe anläßlich der Verleihung des Rudolf-Henn-Preises für Operations Research, Karlsruhe, Februar 2002 - Planung diskreter und kontinuierlicher Materialflüsse.
SAP AG, Walldorf, Oktober 2001 - Scheduling continuous material flows. PDF
Symposium on Operations Research 2001, Duisburg, September 2001 - Solution procedures for production planning and detailed scheduling in process industries.
International Conference on Industrial Engineering and Production Management, Québec City, August 2001 - Project scheduling with sequence-dependent changeover times.
18th European Conference on Operational Research, Rotterdam, Juli 2001 - Scheduling batch and continuous production in chemical industry.
Sitzung der Arbeitsgruppe Projektmanagement der Gesellschaft für Operations Research bei der BASF AG, Ludwigshafen, Mai 2001 - Projektplanung mit Transferzeiten.
10. DFG-Workshop über Projektplanung mit beschränkten Ressourcen, Berlin, April 2001 - Ein Dekompositionsverfahren zur Chargenplanung in der Prozeßindustrie.
Mathematisches Forum der BASF AG, Ludwigshafen, November 2000 - Bestandsmanagement im Detailed Scheduling.
Sitzung der Arbeitsgruppe Lagerhaltung der Gesellschaft für Operations Research bei der KPMG, Leipzig, Oktober 2000 - Scheduling and Resource Allocation: Bericht zum gemeinsamen Forschungsvorhaben 1997-2000.
SAP AG, Walldorf, September 2000 - A branch-and-bound algorithm for the capital-rationed net present value problem.
17th European Conference on Operational Research, Budapest, Juli 2000 - Local search for project scheduling with convex objective functions.
7th Workshop of the EURO Working Group on Project Management and Scheduling, Osnabrück, April 2000 - Reactive scheduling via earliness-tardiness cost minimization of resource-constrained projects.
SAP AG, Walldorf, Dezember 1999 - Lösung eines Batch-Scheduling-Problems der chemischen Industrie.
Bayer AG, Leverkusen, November 1999 - Minimizing earliness-tardiness costs of resource-constrained projects.
Symposium on Operations Research 1999, Magdeburg, September 1999 - A branch-and-bound algorithm for the project duration problem subject to temporal and cumulative resource constraints.
International Conference on Industrial Engineering and Production Managemen, Glasgow, Juli 1999 - Ablaufplanung unter Lagerbeschränkungen.
SAP AG, Walldorf, April 1999 - Anlagenbelegungsplanung in der Prozeßindustrie mit Modellen und Methoden der ressourcenbeschränkten Projektplanung.
6. DFG-Workshop über Projektplanung mit beschränkten Ressourcen, Lambrecht, März 1999 - Generation schemes for the optimization of various classes of objective functions in resource-constrained project scheduling.
16th European Conference on Operational Research, Brüssel, Juli 1998 - Projektplanung bei kumulativen Ressourcenbeschränkungen: Modelle, Methoden und Anwendungen.
10. Südwest-Workshop über OR in Produktion und Logistik, Mannheim, Januar 1998 - Integrated multi-level capacitated lot sizing and temporal plus capacity planning.
International Conference on Industrial Enginieering and Production Management, Lyon, Oktober 1997 - Verfahren zur Lösung des ressourcenbeschränkten Projektdauerminimierungsproblems mit planungsabhängigen Zeitfenstern.
3. DFG-Workshop über Projektplanung mit beschränkten Ressourcen, Kiel, Juli 1997 - Modellierung eines Process-Flow-Scheduling-Problems aus der Prozeßindustrie.
SAP AG, Walldorf, Juni 1997 - A problem generator for resource-constrained project scheduling problems with minimal and maximal time lags.
Workshop on Resource-Constrained Project Scheduling, Karlsruhe, April 1997 - Parametergesteuerte Generierung ressourcenbeschränkter Projektplanungsprobleme mit planungsabhängigen Zeitfenstern.
2. DFG-Workshop über Projektplanung mit beschränkten Ressourcen, Osnabrück, Februar 1997 - Exakte und heuristische Lösungsverfahren für das ressourcenbeschränkte Projektdauerminimierungsproblem mit minimalen und maximalen Zeitabständen.
Interfakultatives Oberseminar "Neue Methoden für schwer lösbare Optimierungsprobleme", Karlsruhe, Januar 1997 - Modelle und Methoden der ressourcenbeschränkten Projektplanung.
6. Südwest-Workshop über OR in Produktion und Logistik, Mannheim, September 1996 - Charakterisierung der Problemschwere von RCPSP/max-Instanzen.
Symposium on Operations Research 1996, Braunschweig, September 1996 - An efficient heuristic for solving resource-constrained project scheduling problems arising from make-to-order production.
Workshop on Production Planning and Control, Mons, September 1996 - A new branch-and-bound-based heuristic for resource-constrained project scheduling with minimal and maximal time lags.
5th Workshop of the EURO Working Group on Project Management and Scheduling, Posnan, April 1996 - ProGen/max: Ein Problemgenerator für ressourcenbeschränkte Projektplanungsprobleme mit zeitlichen Minimal- und Maximalabständen.
Symposium on Operations Research 1995, Passau, September 1995 - Modellierung der Kundenauftragsfertigung als Projekt mit minimalen und maximalen Zeitabständen.
5. Südwest-Workshop über OR in Produktion und Logistik, Karlsruhe, Juni 1995
- Control of shared production buffers: A reinforcement learning approach. PDF
-
Curriculum Vitae
1968 Born in Freiburg im Breisgau May 1987 A levels at Max-Planck-Gymnasium in Lahr/Schwarzwald October 1987 to December 1988 Military service at Air Force Technical School, Erndtebrück and Communication Regiment 31, Meßstetten October 1988 - September 1993 University studies (diploma) in Engineering and Management at the University of Karlsruhe October 1993 - December 1993 Master's degree in Operations Research, RWTH Aachen January 1994 - September 1997 Research assistant at the Institute of Economic Theory and Operations Research, University of Karlsruhe July 1995 - June 2000 Participation in the research project "Project Scheduling with Time Windows" funded by the German Research Foundation DFG July 1997 Public defense of PhD thesis "Verfahren zur Lösung des ressourcenbeschränkten Projektdauerminimierungsproblems mit planungsabhängigen Zeitfenstern" September 1997 - October 2001 Participation in the research and development project "Scheduling and Resource Allocation" funded by SAP AG, Walldorf October 1997 - September 2003 Lecturer at the Institute of Economic Theory and Operations Research of the University of Karlsruhe, head of the Operations Research Software Library of the Management and Economics Department June 2002 Public defense of habilitation thesis "Introduction to Resource Allocation Problems in Project Management", venia legendi for Production and Operations Management October 2003 - March 2004 Associate professor at the Institute of Economic Theory and Operations Research, University of Karlsruhe October 2003 - March 2004 Substitute professor of Information Systems and Operations Research at the University of Halle-Wittenberg April 2004 - present Full professor of Production and Operations Management at Clausthal University of Technology April 2005 - March 2011 Dean of Study Affairs in Management and Economics October 2005 - March 2011 Chair of the examination committee, Department of Management and Economics Fall term 2010/11 Visiting lecturer for Mathematical Programming applications in Operations Management at Bern University Further appointments Director and academic advisor of the Engineering and Management Bachelor program
Commissioner of the academic senate for quality management in education
Member of the examination committee
Member of the admissions committee, Engineering and Management Master programAdvisory councils Editorial board European Journal of Operational Research Referee activities Referee for the journals Annals of Operations Research, Asia-Pacific
Journal of Operational Research, Business Research, Computational
Intelligence, Computers & Industrial Engineering, Construction,
Management and Economics, Discrete Applied Mathematics, European
Journal of Industrial Engineering, European Journal of Operational
Research, Flexible Services and Manufacturing Journal, IIE Transactions,
INFORMS Journal of Computing, International Journal of Operations
and Quantitative Management, International Journal of Production
Economics, International Journal of Production Research, International
Transactions in Operational Research, Japan Journal of Industrial and
Applied Mathematics, Journal of Heuristics, Journal of Scheduling,
Management Science, Mathematical Methods of Operations Research,
Military Operations Research Journal, Networks, Omega, Optimization
and Engineering, OR Spectrum, Production and Operations
Management, Schmalenbach Journal of Business Research, Zeitschrift
für Planung und UnternehmenssteuerungReferee for the Deutsche Forschungsgemeinschaft
Awards Rudolf Henn Award of Operations Research 2001
Prof. Dr. Christoph Schwindt
Operations Management Group
Julius-Albert-Straße 2
38678 Clausthal-Zellerfeld
Room: 115
Phone: +49 (5323) 72 - 7610
Fax: +49 (5323) 72 - 7698
christoph.schwindt@tu-clausthal.de
Office Hours: Tue 10:30 a.m. - 11:30 a.m.
Secretary: Astrid Ludwig
Phone: +49 (5323) 72 - 7615
produktion@tu-clausthal.de
Appointment consultation hours: